S. Bossi, L. Blasi, G. Cupertino, R. dell’Erba, A. Cipollini, S. De Vito, M. Santoro, G. Di Francia, and G. M. Tina, “Floating photovoltaic plant monitoring: A review of requirements and feasible technologies,” Sustainability, vol. 16, no. 19, p. 8367, 2024. [Google Scholar] [Crossref]
2.
A. Ahmed, M. Elsakka, N. Elminshawy, A. Mohamed, and S. Sundaram, “Recent advances in floating photovoltaic systems,” Chem. Rec., vol. 23, no. 12, p. e202300229, 2023. [Google Scholar] [Crossref]
3.
P. Ranjbaran, H. Yousefi, A. Gholami, and A. Sheikhi, “A review on floating photovoltaic (FPV) power generation units,” Renew. Sustain. Energy Rev., vol. 110, pp. 332–347, 2021. [Google Scholar] [Crossref]
4.
M. Abdelgaied, A. E. Kabeel, M. Zeleňáková, and H. F. Abd-Elhamid, “Floating photovoltaic plants as an effective option to reduce water evaporation in water-stressed regions and produce electricity: A case study of Lake Nasser, Egypt,” Water, vol. 15, no. 4, p. 635, 2023. [Google Scholar] [Crossref]
5.
M. A. Koondhar, L. Albasha, I. Mahariq, B. B. Graba, and E. Touti, “Reviewing floating photovoltaic (FPV) technology for solar energy,” Energy Strategy Rev., vol. 54, p. 101449, 2024. [Google Scholar] [Crossref]
6.
P. Venturini, G. G. Gagliardi, G. Agati, L. Cedola, M. V. M. Caputi, and D. Borello, “Integration of floating photovoltaic panels with an Italian hydroelectric power plant,” Energies, vol. 17, no. 4, p. 851, 2024. [Google Scholar] [Crossref]
7.
S. Gadzanku, N. Lee, and A. Dyreson, “Enabling floating solar photovoltaic (FPV) deployment: Exploring the operational benefits of floating solar-hydropower hybrids,” National Renewable Energy Lab. (NREL), Golden, CO (United States), NREL/TP-7A40-83149, 2022. [Online]. Available: https://www.nrel.gov/docs/fy22osti/83149.pdf [Google Scholar]
8.
A. Djalab, Z. Djalab, A. El Hammoumi, G. M. Tina, S. Motahhir, and A. A. Laouid, “A comprehensive review of floating photovoltaic systems: Tech advances, marine environmental influences on offshore PV systems, and economic feasibility analysis,” Sol. Energy, vol. 277, p. 112711, 2024. [Google Scholar] [Crossref]
9.
S. R. K. Soltani, A. Mostafaeipour, P. Mishra, S. Alidoost, M. Jahangiri, and M. A. Kar, “Green hydrogen production and prediction using floating photovoltaic panels on wastewater ponds,” Renew. Energy, vol. 243, p. 122554, 2025. [Google Scholar] [Crossref]
10.
R. Muthia, A. S. P. Pramudya, M. R. Maulana, and W. W. Purwanto, “Techno-economic analysis of green hydrogen production by a floating solar photovoltaic system for industrial decarbonization,” Clean Energy, vol. 8, no. 4, pp. 1–14, 2024. [Google Scholar] [Crossref]
11.
M. A. Islam, M. M. N. Ali, I. B. Benitez, S. S. Habib, T. Jamal, A. Flah, V. Blazek, and C. Z. El-Bayeh, “A comprehensive evaluation of photovoltaic simulation software: A decision-making approach using Analytic Hierarchy Process and performance analysis,” Energy Strategy Rev., vol. 58, p. 101663, 2025. [Google Scholar] [Crossref]
12.
Y. Zhou, S. Chaudhary, C. Hutton, and T. Rahman, “Techno-economic and sensitivity analysis of floating photovoltaics for river island communities in Bangladesh,” Energy Sustain. Dev., vol. 83, p. 101539, 2024. [Google Scholar] [Crossref]
13.
C. Veliathur Chinnasamy Srinivasan, P. K. Soori, and F. A. Ghaith, “Techno-economic feasibility of the use of floating solar PV systems in oil platforms,” Sustainability, vol. 16, no. 3, p. 1039, 2024. [Google Scholar] [Crossref]
14.
A. El-Maaroufi, M. Daoudi, and R. A. Laamara, “Techno-economic analysis of a PV/WT/biomass off-grid hybrid power system for rural electrification in northern Morocco using HOMER,” Renew. Energy, vol. 231, p. 120904, 2024. [Google Scholar] [Crossref]
15.
J. D. A. Dardon and H. Farzaneh, “Techno-economic analysis of a hybrid photovoltaic-wind-biomass-battery system for off-grid power in rural Guatemala,” Util. Policy, vol. 88, p. 101762, 2024. [Google Scholar] [Crossref]
16.
S. D. Prasetyo, B. B. P. Pranata, M. S. Alfaridzi, Z. Arifin, C. Harsito, M. S. Mauludin, and A. Kusumawardana, “Techno-economic assessment of solar power plants on river land in Indonesia using HOMER Pro,” J. Urban Dev. Manag., vol. 3, no. 3, pp. 164–175, 2024. [Google Scholar] [Crossref]
17.
N. M. Kumar, S. Islam, A. K. Podder, A. Selim, M. Bajaj, and S. Kamel, “Lifecycle-based feasibility indicators for floating solar photovoltaic plants along with implementable energy enhancement strategies and framework-driven assessment approaches leading to advancements in the simulation tool,” Front. Energy Res., vol. 11, p. 1075384, 2023. [Google Scholar] [Crossref]
18.
N. A. Pambudi, R. A. Firdaus, R. Rizkiana, D. K. Ulfa, M. S. Salsabila, Suharno, and Sukatiman, “Renewable energy in Indonesia: Current status, potential, and future development,” Sustainability, vol. 15, no. 3, p. 2342, 2023. [Google Scholar] [Crossref]
19.
B. P. Resosudarmo, J. F. Rezki, and Y. Effendi, “Prospects of energy transition in Indonesia,” Bull. Indones. Econ. Stud., vol. 59, no. 2, pp. 149–177, 2023. [Google Scholar] [Crossref]
20.
M. Adrian, E. P. Purnomo, A. Enrici, and T. Khairunnisa, “Energy transition towards renewable energy in Indonesia,” Herit. Sustain. Dev., vol. 5, no. 1, pp. 107–118, 2023. [Google Scholar] [Crossref]
21.
M. Yuniza, D. Salim, H. Triyana, and M. Triatmodjo, “Revisiting just energy transition in Indonesia energy transition policy,” J. World Energy Law Bus., vol. 17, no. 2, pp. 118–127, 2024. [Google Scholar] [Crossref]
22.
M. Rifansyah and D. F. Hakam, “Techno economic study of floating solar photovoltaic project in Indonesia using RETscreen,” Clean. Energy Syst., vol. 9, p. 100155, 2024. [Google Scholar] [Crossref]
23.
Y. Wei, D. Khojasteh, C. Windt, and L. Huang, “An interdisciplinary literature review of floating solar power plants,” Renew. Sustain. Energy Rev., vol. 209, p. 115094, 2025. [Google Scholar] [Crossref]
24.
G. Chowdhury, M. Haggag, and J. Poortmans, “How cool is floating PV? A state-of-the-art review of floating PV’s potential gain and computational fluid dynamics modeling to find its root cause,” EPJ Photovoltaics, vol. 14, p. 24, 2023. [Google Scholar] [Crossref]
25.
F. K. Alhousni, F. B. I. Alnaimi, P. C. Okonkwo, I. Ben Belgacem, H. Mohamed, and E. M. Barhoumi, “Photovoltaic power prediction using analytical models and HOMER-Pro: Investigation of results reliability,” Sustainability, vol. 15, no. 11, p. 8904, 2023. [Google Scholar] [Crossref]
26.
C. Vargas-Salgado, D. Díaz-Bello, D. Alfonso-Solar, and F. Lara-Vargas, “Validations of HOMER and SAM tools in predicting energy flows and economic analysis for renewable systems: Comparison to a real-world system result,” Sustain. Energy Technol. Assess., vol. 69, p. 103896, 2024. [Google Scholar] [Crossref]
27.
O. A. Odetoye, P. K. Olulope, O. M. Olanrewaju, A. O. Alimi, and O. G. Igbinosa, “Multi-year techno-economic assessment of proposed zero-emission hybrid community microgrid in Nigeria using HOMER,” Heliyon, vol. 9, no. 9, p. e19189, 2023. [Google Scholar] [Crossref]
28.
F. Mandys, M. Chitnis, and S. R. P. Silva, “Levelized cost estimates of solar photovoltaic electricity in the United Kingdom until 2035,” Patterns, vol. 4, no. 5, p. 100735, 2023. [Google Scholar] [Crossref]
29.
I. Esparza, Á. Olábarri Candela, L. Huang, Y. Yang, C. Budiono, S. Riyadi, W. Hetharia, R. Hantoro, D. Setyawan, I. K. A. P. Utama, and et al., “Floating PV systems as an alternative power source: Case study on three representative islands of Indonesia,” Sustainability, vol. 16, no. 3, p. 1345, 2024. [Google Scholar] [Crossref]
30.
A. Mdallal, A. Yasin, M. Mahmoud, M. A. Abdelkareem, A. H. Alami, and A. G. Olabi, “A comprehensive review on solar photovoltaics: Navigating generational shifts, innovations, and sustainability,” Sustain. Horiz., vol. 13, p. 100137, 2025. [Google Scholar] [Crossref]
31.
U. Pfeifroth, J. Drücke, S. Kothe, J. Trentmann, M. Schröder, and R. Hollmann, “SARAH-3–satellite-based climate data records of surface solar radiation,” Earth Syst. Sci. Data, vol. 16, no. 11, pp. 5243–5265, 2024. [Google Scholar] [Crossref]
32.
K. Wang, Y. Y. Da, H. R. Bi, Y. H. Liu, B. Q. Chen, M. Wang, Z. H. Liu, J. Nielsen, and T. W. Tan, “A one-carbon chemicals conversion strategy to produce precursor of biofuels with Saccharomyces cerevisiae,” Renew. Energy, vol. 208, pp. 331–340, 2023. [Google Scholar] [Crossref]
33.
Y. B. Jin, S. J. Hu, A. D. Ziegler, L. Gibson, J. E. Campbell, R. R. Xu, D. L. Chen, K. Zhu, Y. Zhen, and B. Ye, “Energy production and water savings from floating solar photovoltaics on global reservoirs,” Nat. Sustain., vol. 6, pp. 865–874, 2023. [Google Scholar] [Crossref]
34.
C. Ferrer-Gisbert, J. J. Ferrán-Gozálvez, M. Redón-Santafé, P. Ferrer-Gisbert, F. J. Sánchez-Romero, and J. B. Torregrosa-Soler, “A new photovoltaic floating cover system for water reservoirs,” Renew. Energy, vol. 60, pp. 63–70, 2013. [Google Scholar] [Crossref]
35.
A. Sahu, N. Yadav, and K. Sudhakar, “Floating photovoltaic power plant: A review,” Renew. Sustain. Energy Rev., vol. 66, pp. 815–824, 2016. [Google Scholar] [Crossref]
36.
N. H. Nguyen, B. C. Le, and T. T. Bui, “Benefit analysis of grid-connected floating photovoltaic system on the hydropower reservoir,” Appl. Sci., vol. 13, no. 5, p. 2948, 2023. [Google Scholar] [Crossref]
37.
A. Ghigo, E. Faraggiana, M. Sirigu, G. Mattiazzo, and G. Bracco, “Design and analysis of a floating photovoltaic system for offshore installation: The case study of Lampedusa,” Energies, vol. 15, no. 23, p. 8804, 2022. [Google Scholar] [Crossref]
38.
G. Kakoulaki, R. Gonzalez Sanchez, A. Gracia Amillo, S. Szabó, M. De Felice, F. Farinosi, L. De Felice, B. Bisselink, R. Seliger, I. Kougias, and A. Jaeger-Waldau, “Benefits of pairing floating solar photovoltaics with hydropower reservoirs in Europe,” Renew. Sustain. Energy Rev., vol. 171, p. 112989, 2023. [Google Scholar] [Crossref]
39.
Ministry of Energy and Mineral Resources of the Republic of Indonesia, “Regulation of the Minister of Energy and Mineral Resources No. 7 of 2024 on Electricity Tariffs Provided by PT PLN (Persero),” Jakarta, Indonesia, 2024. [Online]. Available: https://jdih.esdm.go.id/dokumen/download?id=Permen+ESDM+Nomor+7+Tahun+2024.pdf [Google Scholar]
40.
Ministry of Energy and Mineral Resources of the Republic of Indonesia, “Ministerial Regulation No. 49 of 2018 on the Use of Rooftop Solar Power Systems by PLN Consumers,” Jakarta, Indonesia, 2018. [Online]. Available: https://peraturan.bpk.go.id/Home/Download/133718/Permen%20ESDM%20Nomor%2049%20Tahun%202018.pdf [Google Scholar]
Search
Open Access
Research article

Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study

Rama Pujangga*,
Mukhammad Zaidan Apriliyansah
Power Plant Engineering Technology, Faculty of Vocational Studies, State University of Malang, 65145 Malang, Indonesia
Journal of Sustainability for Energy
|
Volume 4, Issue 2, 2025
|
Pages 174-188
Received: 04-29-2025,
Revised: 06-14-2025,
Accepted: 06-22-2025,
Available online: 06-29-2025
View Full Article|Download PDF

Abstract:

The techno-economic performance of a 10 MW floating photovoltaic (FPV) system on Lake Ranu Grati has been evaluated using HOMER Pro simulations, incorporating a representative medium-voltage load profile to assess feasibility under realistic operational conditions. The system is projected to generate approximately 15.35 GWh of electricity annually, with a capacity factor of 17.5%, demonstrating stable output under tropical irradiance patterns. The majority of the FPV-generated electricity is expected to supply local medium-voltage loads, while surplus energy will be exported to the national grid, resulting in a renewable energy share of approximately 80% throughout the year. Economic analysis indicates a Net Present Cost (NPC) of USD 12.9 million and a Levelized Cost of Energy (LCOE) of USD 0.053/kWh, both of which are competitive compared to the prevailing industrial electricity tariffs in Indonesia. The Internal Rate of Return (IRR) is calculated at 9.2%, with an estimated payback period of approximately 10 years. Environmentally, the FPV system is projected to reduce CO₂ emissions by around 11,000 tonnes per year, while simultaneously preserving land resources and enhancing the utilization of water surfaces. Overall, the Ranu Grati FPV project demonstrates strong technical performance, economic feasibility, and significant environmental benefits, making it a promising solution for Indonesia’s transition towards sustainable energy.

Keywords: Floating photovoltaic, Techno-economic assessment, HOMER simulation, Grid-connected photovoltaic, Levelized Cost of Energy, Ranu Grati Lake, Indonesia, Renewable energy, Floating solar, Environmental impact

1. Introduction

The global demand for clean electricity is increasing due to the environmental impacts associated with the consumption of fossil fuels [1]. Solar photovoltaic (PV) technology has become one of the most effective renewable alternatives to address this challenge [2]. Among various PV applications, floating photovoltaic (FPV) systems—PV modules installed on water surfaces such as reservoirs and lakes—offer essential advantages, including reduced land use and improved energy efficiency due to the natural cooling effect of water [3]. FPV systems can also reduce water evaporation and suppress algal growth, thereby contributing to better water quality [4]. These benefits are particularly relevant for regions facing land limitations and growing renewable-energy needs, including East Java Province, where the installed capacity of solar power plants remains relatively limited compared to regional energy demand.

Accurate performance and economic assessment of FPV systems requires reliable modeling tools. HOMER Pro is widely used for comprehensive simulation and optimization of renewable energy systems [5]. Previous studies have shown that integrating FPV with hydropower can increase annual electricity production, reduce intermittency, and lower the Levelized Cost of Energy (LCOE) [6]. Other research has explored the combination of FPV with hydrogen storage, demonstrating its potential to form fully renewable energy systems for industrial applications and remote communities [7].

Numerous techno-economic studies have evaluated FPV performance using indicators such as Net Present Cost (NPC), LCOE, and emission reductions [8]. Comparative assessments generally report that FPV can outperform land-based PV in terms of energy output and cost-effectiveness, especially in locations with high irradiance or limited land availability [9]. Several large-scale FPV projects in Indonesia have also shown promising feasibility results [10]. At the same time, HOMER-based analyses further confirm that FPV installations on reservoirs can deliver stable and competitive electricity generation [11]. However, most previous studies did not incorporate regional demand characteristics or site-specific operational contexts.

In the present study, the load profile used is not derived from direct field measurements but is constructed from representative demand patterns commonly applied in medium-voltage system analyses. This approach is widely accepted in techno-economic modeling when long-term measured load data are unavailable, and still allows the simulation to reflect realistic consumption behavior.

Based on this background, this study evaluates the technical and economic performance of a 10 MW FPV system at Lake Ranu Grati, Pasuruan, Indonesia. The findings aim to provide insights into the practical and sustainable implementation of FPV in tropical regions, while supporting increased solar deployment in East Java. A summary of recent FPV studies is presented in Table 1.

Table 1. Summary of recent studies on floating photovoltaic (FPV) systems

Method/Approach

Location

Main Findings

Comparative Insight

Reference

Techno-economic and sensitivity analysis using HOMER Pro

Bangladesh (river islands), 2–5 MW

Net Present Cost (NPC) $\approx$ USD 2.3 M; Levelized Cost of Energy (LCOE) $\approx$ 0.036 USD/kWh; FPV feasible for off-grid communities

Off-grid context; high sensitivity to solar uncertainty

[12]

Techno-economic feasibility using RETScreen

Cirata Reservoir, Indonesia, 145 MW

Internal Rate of Return (IRR) $\approx$ 11%; Payback $\approx$ 9 years; large-scale FPV feasible

Uses RETScreen (simplified model); focuses on utility-scale FPV without load integration

[13]

Techno-economic analysis of photovoltaic (PV)/ wind turbine /biomass hybrid system using HOMER

Northern Morocco (rural area)

Demonstrates the feasibility of a hybrid PV/wind turbine /biomass system

Not FPV; hybrid multi-source system; rural electrification context

[14]

Techno-economic modeling of hybrid FPV-hydropower using HOMER Pro

Guatamela

FPV improves reliability, reduces LCOE, and stabilizes output

FPV integrated with hydropower; not standalone FPV

[15]

Techno-economic analysis using HOMER Pro

Surakarta, Indonesia, 25 kWp

LCOE $\approx$ 0.031 USD/kWh; competitive with Perusahaan Listrik Negara (PLN) tariff

Small-scale rooftop/land PV; no floating design; different scale

[16]

This Study

Ranu Grati Lake, Indonesia—10 MW FPV

Technical-economic evaluation using HOMER Pro with an assumed representative Medium Voltage load profile

First Indonesian FPV study evaluating 10 MW capacity using a realistic assumed load pattern, bridging the gap between generic models and local demand characteristics

-

2. Methodology

This study presents a techno-economic assessment to determine the feasibility of a 10 MW floating solar PV system on Lake Ranu Grati. The study methodology encompasses various parameters, including site characterization, system design optimization, solar resource evaluation, load profile analysis, and economic analysis using HOMER Pro. By following a systematic methodology, the technical and financial variables of the FPV system are thoroughly examined to determine its feasibility under existing climatic and economic conditions.

2.1 Research Flow Chart

The overall operation of the FPV system is presented in Figure 1, which depicts the sequence of energy flow from solar irradiation to grid interaction. In this configuration, sunlight is captured by the PV modules and converted into direct current (DC) electricity. The inverter subsequently converts the DC output into alternating current (AC) for supplying local loads, while any surplus energy is exported to the Perusahaan Listrik Negara (PLN) grid.

Figure 1 highlights the essential stages of energy conversion and distribution, deliberately omitting auxiliary elements such as monitoring, protection, and control components for simplicity. This schematic effectively illustrates how the FPV installation maintains continuous interaction with the grid and delivers stable renewable power despite fluctuations in solar availability.

Figure 1. Methodology flowchart of the floating photovoltaic (FPV) study
2.2 Research Location and Object

The research was conducted in the beautiful Lake Ranu Grati of Pasuruan Regency, District of Grati, East Java Province, Indonesia. The geographical location of the study area is shown in Figure 2. The natural freshwater lake occupies approximately 107 hectares and is 200 meters above sea level [17]. The landscape comprises agricultural fields, rural towns, and rolling hills, making it a peaceful and suitable location for renewable energy development, particularly FPV systems [18]. Geologically, the lake was formed through ancient volcanic eruptions, creating a stable basin with peaceful hydrodynamic properties that are ideal for floating solar farms [19].

Figure 2. Location Ranu Grati Lake

Ranu Grati also serves as a vital resource for the local community, supporting fisheries, aquaculture, irrigation, and tourism. Therefore, the FPV project should be closely managed to maintain these activities in equilibrium and avoid potential land-use conflicts [20]. The regional tropical monsoon climate features temperatures ranging from 24°C to 32°C and annual rainfall of 1,500–2,000 mm. The region's climatic conditions, high solar irradiance, flat water surfaces, and gentle winds favor FPV energy production [21], [22].

Proximity to towns and the presence of PLN grid infrastructure facilitate the efficient transmission of electricity and grid integration [23]. Socioeconomically, Pasuruan Regency has exhibited steady growth in energy demand for residential, industrial, and agricultural uses. Due to the limited land area capacity for massive ground-mounted PV projects, Lake Ranu Grati offers a strategic and sustainable solution that maximizes space efficiency and improves local energy security [24].

At 07°43′56.08″ S and 113°00′51.32″ E coordinates, the site’s accessibility, favorable solar potential, and safe environment make it an ideal case to emulate for future deployment of FPV and Indonesian renewable energy development.

Although the site shows strong suitability for FPV deployment, several limitations should be noted. Seasonal and annual climate variability may affect long-term energy output beyond the simulated period. Floating components such as pontoons and mooring systems may experience degradation over time, which was not modeled in this study. Potential ecological impacts on the lake, such as changes in water temperature or aquatic conditions, were also not assessed. The key technical assumptions and system parameters adopted in this study are summarized in Table 2. These factors define the boundaries of this analysis and indicate the need for future investigation.

Table 2. Key site parameters and study limitations (concise version)

Parameter

Value/Description

Location

Lake Ranu Grati, Pasuruan Regency, East Java

Surface area

$\sim$107 hectares

Elevation

$\sim$200 m above sea level

Climate

Tropical monsoon; 24–32℃; 1,500–2,000 mm rainfall

Solar potential

High irradiance suitable for floating photovoltaic (FPV)

Water condition

Calm water surface; stable volcanic basin

Grid availability

Connected to the Perusahaan Listrik Negara (PLN) distribution network

Key limitations

Climate variability, potential floating-structure degradation, and ecological uncertainties

2.3 Description of the PLTS (Solar PV System) Design Model (on-Grid)

The suggested 10 MW FPV station at Lake Ranu Grati Pasuruan is designed as an on-grid power station integrated with the PLN (State Electricity Company) grid connection. The design allows for a safe and steady supply of electricity. Solar radiation is first converted to DC by PV modules and subsequently converted to AC by inverters to supply to nearby customers. The grid connection enables two-way power flow, allowing for the export of excess power to PLN during periods of high production and the import of electricity when generation is low, such as at night or on cloudy days [25]. The overall configuration and power flow of the proposed on-grid FPV system are illustrated in Figure 3.

Figure 3. Floating photovoltaic (FPV) design system in Homer Pro

The system has four key components: floating PV arrays, inverter units, local loads, and the PLN grid. The floating configuration enhances efficiency by utilizing water cooling, reducing evaporation, and conserving land space [26]. Inverters manage power conversion and synchronization with the grid [27], while local loads are residential, commercial, and industrial users in Pasuruan.

The PLN grid serves as both a source of energy and a destination for redundant power, thereby maintaining equilibrium in the system. FPV operates on a daily cycle—meeting most of the load, exporting surplus during peak sunlight, balancing the load during moderate irradiance, and relying on PLN during nighttime. It eliminates mass energy storage, lowering costs while maintaining dependability [28]. The techno-economic performance was modeled using HOMER Pro software, taking into account aspects such as NPC, LCOE, and Break Even Point (BEP) to ascertain feasibility and competitiveness [29], [30]. At a global level, the system contributes to local energy resilience and supports Indonesia’s transition towards renewable energy.

2.4 Potential Use of Solar Energy

To assess the solar energy potential at Lake Ranu Grati, this study utilized data from the Global Solar Atlas (2025), which provides monthly Global Horizontal Irradiance and Direct Normal Irradiance values. These values were cross-checked with the SARAH-3 satellite dataset to ensure accuracy under tropical conditions [31]. Seasonal Direct Normal Irradiance variations reflect East Java’s monsoon climate, with higher solar intensity in the dry season and lower values during the wet months [32].

As shown in Table 3, the highest Direct Normal Irradiance occurs in August (193.8 kWh/m2) and the lowest in February (82.5 kWh/m2), confirming that Ranu Grati has consistently strong solar resources suitable for FPV development. These irradiation datasets serve as key inputs for HOMER Pro simulations and underpin the projected energy yield of the system.

Table 3. Potential use of solar energy

Mounth

Irradiation (kWh/m2)

January

86,8

February

82,5

March

106,3

April

124,8

May

150,8

June

154,1

July

176,1

August

193,8

September

190,3

October

119,1

November

169,3

December

83,2

2.5 Economic and Financial Assumptions

Table 4 presents the cost assumptions used in the simulation with HOMER Pro. The initial capital of the FPV plant—PV modules, floating structure, balance of system (BOS) components, engineering, and installation—is estimated at USD 12.0 million. Another USD 0.8 million is spent on the inverter unit, so the total capital expenditure (CAPEX) of the 10 MW FPV plant is around USD 12.8 million. Annual operation and maintenance (O&M) expense expense for the PV array is approximately USD 150,000, and that of the inverter is USD 15,000.

These inputs on cost are in line with international cost benchmarks developed by the International Renewable Energy Agency, as well as ASEAN Centre for Energy reports that specify similar investment scales for FPV projects in Southeast Asia [33], [34]. Collectively, these costs as estimated form a legitimate basis upon which the project’s economic viability can be determined in the HOMER Pro simulation.

Table 4. Cost assumptions used in the simulations

Component

Cost (USD)

Remarks

Photovoltaic (PV) System (modules, floating structure, balance of system (BOS), installation & engineering)

12,000,000

Total cost of a 10 MW floating PV system

Inverter (10 MW, bidirectional)

800,000

Separate cost for the power conversion system

Total capital expenditure (CAPEX)

12,800,000

Overall investment cost of the project

Annual PV operation and maintenance (O&M)

150,000/year

Estimated O&M cost of the PV system

Annual Inverter O&M

15,000/year

The estimated O&M cost of the inverter

2.6 System Specifications and Design Parameters

FPV systems comprise solar panels mounted on floating platforms above bodies of water. The system is helpful in several aspects, including improved panel efficiency due to the natural cooling offered by water, reduced evaporation rates, and reduced land use [35]. In this study, a 10 MW FPV plant was modeled using HOMER Pro software, considering an initial investment of USD 12 million and an annual O&M cost of USD 150,000. The plant has been designed for a 25-year commercial life with an 85% derating factor, a module efficiency of 17–18%, and a tilt angle of 10° to 15°. Although floating PV systems typically require 10–15% more upfront costs than land-based PV systems, their high performance and land-space savings make floating PV systems economically viable for tropical regions [36].

In HOMER-based analysis, project economic viability is measured primarily by NPC and Cost of Energy (COE). NPC is the system lifetime cost, and COE is the average cost per kilowatt-hour of produced energy. These parameters provide a comprehensive view of system cost-effectiveness and serve as benchmarks for comparing different FPV configurations.

2.6.1 The equation calculating the NPC
$\mathrm{NPC}=\frac{C_{ann,tot}}{\operatorname{CRF}\left(i, R_{p r o j}\right)}$
(1)

where, Cann,tot is the total annualized cost of the system (USD/year), including capital, replacement, O&M, and other associated costs; Capital Recovery Factor (CRF) is the capital recovery factor; i is the real annual discount rate; Rproj is the project lifetime (year).

2.6.2 COE

COE or LCOE represents the average cost per kilowatt-hour of electricity generated throughout the system’s operational period. It is obtained by dividing the total annualized cost by total energy production.

The COE can be calculated using the equation:

$\operatorname{COE}=\frac{C_{ann,tot}}{E_{prim,A C}+E_{prim, D C}}$
(2)

where, Eprim, DC is the annual primary AC electrical energy supplied to the load (kWh/year); Eprim, DC is the annual primary DC electrical energy supplied to the load (kWh/year).

2.6.3 BEP

BEP indicates the time required for the project to recover its initial investment from cumulative net profits. A shorter BEP reflects a faster return on investment and higher economic attractiveness.

The BEP can be estimated using the following expression:

$\mathrm{BEP}=\frac{\text { Total Investment }}{\text { Annual Net Cash Flow }}$
(3)
2.7 FPV System

FPV refers to a new generation of solar power technology in which PV panels are installed on floating platforms that float over bodies of water. FPV installations offer numerous benefits over conventional ground-mounted installations, including greater efficiency due to the water-cooling effect, lower evaporation rates, and reduced land use.

Based on the HOMER Pro simulation presented in Table 5, the simulated FPV system in this work has an installed capacity of 10 MW, a total investment cost of USD 12.0 million, and an annual O&M cost of USD 150,000. The design incorporates an 85% derating factor and a 25-year lifespan, and the investment encompasses PV modules, floating structures, anchoring mechanisms, and BOS components. These adhere to international standards for large-scale deployment of FPV, and current studies confirm that FPV systems have 5–10% more annual energy output than ground-based PV systems under the same solar conditions [37].

Hence, the 10 MW FPV power plant on Lake Ranu Grati can be regarded as both technically and economically feasible, particularly in areas where land resources are scarce but water surface areas are abundant. This case demonstrates the promise of FPV systems as a sustainable and scalable means of introducing solar energy capacity in Indonesia.

Table 5. Parameter photovoltaic (PV) in HOMER

Parameter

Value

Unit

Description

Rated capacity

10,000

kW

Installed PV capacity in the simulation

Capital cost

12,000,000

USD

Includes items (excluding the inverter): PV modules, floats, wiring, mounting, and balance of system (BOS)

Replacement cost

-

-

Not considered in the simulation

Operation and maintenance (O&M) cost

150,000

USD/year

Annual O&M cost

Lifetime

25

year

Project and component design lifetime

Derating factor

8

%

Accounts for temperature, dust, and wiring losses

Efficiency

~17–18

%

Average PV module efficiency assumed

Tilt angle

10–15

°

Based on a floating structure design

Azimuth

0 (South)

°

Oriented to maximize annual irradiation

2.8 Converter (Inverter)

The inverter (HOMER Pro converter) is a key component that converts the DC output of the PV modules into grid-compatible AC power. The system utilizes a 10 MW converter with an initial capital cost of USD 800,000, an annual O&M cost of USD 15,000, and a replacement cost of USD 800,000 due to its shorter lifespan compared to PV modules. The inverter has a 12-year design life and achieves 98% efficiency in both inverter and rectifier modes, which is consistent with utility-scale standards [38]. As presented in Table 6, the inverter parameters include capacity, cost components, lifetime, and efficiency values used in the HOMER Pro simulation.

Unlike PV modules, which include floating structures and BOS costs, the inverter is treated as a separate cost category to maintain accurate system architecture and lifecycle assessment. Since inverters require replacement during the 25-year project life, their modular design and high efficiency help minimize conversion losses, supporting overall system reliability and economic performance.

Table 6. Parameter converter

Parameter

Value

Unit

Capacity

10,000

kW

Capital Cost

800,000

USD

Replacement Cost

800,000

USD

Operation and maintenance (O&M) Cost

15,000

USD/year

Lifetime

12

Year

Inverter Efficiency

98

%

Rectifier Efficiency

98

%

2.9 Electric Load Profile

The simulated system load profile is illustrated in Table 7 and Figure 4. The average daily load for the system is approximately 24,000 kWh, and the average demand is 1,000 kW, peaking at 2,576 kW; thus, the load factor is 0.39. The minimum demand occurs in the morning (approximately 667 kW) and increases steadily after 06:00, when domestic and commercial loads are resumed. Demand is greater between 09:00 and 16:00, with a range of 1,500 to 2,500 kW, and dwindles towards late evening as the power load decreases.

Table 7. Daily load distribution and total consumption

WIB

kW

Hours

kWh

Load (%)

Description

00:00–03:00

700

4

2,800

11.7

Base load (low demand)

04:00–06:00

950

3

2,850

11.9

Beginning of load increase

07:00–09:00

1,400

3

4,200

17.5

Morning activity increases

10:00–16:00

2,000

7

14,000

58.3

Peak load during the daytime

17:00–20:00

1,250

4

5,000

20.8

Evening consumption remains high

21:00–23:00

800

3

2,400

10.0

Nighttime demand decreases

Total

-

24

24,000

100

As scaled in HOMER Pro

Note: Time is given in Waktu Indonesia Barat (WIB), GMT+7
Figure 4. Grafik daily load profile

This is characteristic of the high commercial and residential energy consumption regimes, where most consumption is during the day and closely follows the solar generation profiles. This synchronism between demand and PV generation maximizes the efficiency of FPV system operation by minimizing energy mismatch and grid reliance during the day. FPV power generation is the top priority when supplying local loads under simulation. Excess power is provided to the grid, and shortages are automatically met by drawing power from it; hence, there is a round-the-clock and assured power supply throughout the day.

This table shows that the daytime peak period (10:00–16:00) accounts for more than half of the daily consumption (58.3%), followed by the evening load (20.8%) and the morning load (17.5%). The lowest demand occurs at night (10–12% of the total). This distribution highlights the strong alignment between peak demand and solar generation potential, reinforcing the effectiveness of integrating floating PV in meeting daily load requirements.

2.10 Grid Connection

The FPV system operates as a grid-connected installation, enabling two-way electricity exchange with the PLN network. When solar generation is insufficient, electricity is imported from the grid, while surplus generation is exported. For the economic simulation, this study applies a non-subsidized industrial medium-voltage electricity tariff of Indonesian Rupiah (IDR) 1,114.74/kWh ($\approx$USD 0.0719/kWh), in accordance with the PLN electricity tariff determined by the Ministry of Energy and Mineral Resources for the 2023–2024 period [39].

As the basis for determining the selling price of exported electricity, this study refers to Ministerial Regulation of Ministry of Energy and Mineral Resources No. 49 of 2018, under which exported renewable electricity is compensated at 65% of the applicable PLN tariff, equivalent to approximately IDR 725/kWh ($\approx$USD 0.0467/kWh). Both the purchase and export tariffs are directly implemented in the HOMER Pro model. Because the export tariff is lower than the purchase tariff, maximizing self-consumption becomes a critical factor in improving the economic feasibility of the FPV project [40].

3. Result

3.1 Technical Performance of the FPV System

The 10 MW FPV power plant at Lake Ranu Grati demonstrates stable performance throughout the year, indicating strong suitability for tropical regions. Seasonal irradiance patterns—higher in the dry season and lower during the rainy months—cause corresponding fluctuations in monthly output. Despite these variations, the annual generation remains consistent, supporting the regional electricity supply.

Simulation results indicate that the system generates approximately 15.35 GWh of electricity annually. Part of this energy is used to supply the local medium-voltage loads, while the surplus is exported to the PLN grid. According to the HOMER Pro results (Table 8), the FPV system exports about 10.04 GWh/year and imports around 3.75 GWh/year during nighttime or periods of low irradiance. The renewable fraction of 80% indicates that, over the year, roughly 80% of the total load energy is supplied by the FPV system and the remaining 20% by the grid.

Table 8. Simulation results

Parameter

Unit

Value

Description

Photovoltaic (PV) capacity

kW

10,000

Installed solar array capacity

Annual PV production

kWh/a

15,352,955

Total annual solar energy generated

Energy sold to grid

kWh/a

10,039,698

Surplus electricity is exported to the Perusahaan Listrik Negara (PLN) grid

Energy purchased from grid

kWh/a

3,753,802

Electricity is imported from PLN during low solar output

Renewable fraction

%

80.0

Share of total load met by renewable generation

Initial capital cost

USD

12,800,000‌

Total investment for PV and balance of system (BOS) components

Net Present Cost (NPC)

USD

12.900,000

Total discounted project lifetime cost

Levelized Cost of Energy (LCOE)

USD/kWh

0.053

Average lifetime cost of energy production

Operating cost

USD/yr

6,346

Annual operation and maintenance (O&M) expenses

The floating configuration enhances performance through natural water-based cooling, which reduces thermal losses and improves module efficiency compared with ground-mounted systems. The alignment between PV generation and daytime demand also minimizes curtailment and increases self-consumption. Economically, the system achieves an LCOE of USD 0.053/kWh and an NPC of USD 12.88 million, confirming its feasibility under Indonesia’s prevailing tariff conditions. Overall, the Lake Ranu Grati FPV project demonstrates strong technical and economic performance in a tropical climate.

Figure 5 shows the monthly electricity output of the FPV system. Generation increases from January and reaches its highest levels from July to September during the dry season, when solar irradiance is strongest. This seasonal trend reflects the strong influence of tropical solar irradiance conditions on FPV system performance. Reduced energy production during the rainy months is primarily caused by increased cloud cover, higher atmospheric moisture, and more frequent rainfall, which limit solar radiation reaching the PV modules. In contrast, the dry season offers clearer skies and longer effective sunshine hours, resulting in higher monthly electricity generation. Despite these seasonal variations, the overall production profile remains relatively stable without sharp declines, indicating reliable system operation. This stability is beneficial for grid-connected applications, as it supports more predictable energy planning and enhances the contribution of FPV systems to local electricity supply throughout the year.

Figure 5. Grafik monthly photovoltaic (PV) energy production

To evaluate the interaction between supply and demand, the system output was compared with the daily load profile shown in Figure 6. The load profile used in this study is assumed, not measured data. Because actual load measurements were not available at the project site, the load curve was developed using standard load-shape patterns commonly applied in Indonesian distribution networks. The profile was then scaled to represent a typical mixed-load condition (residential, commercial, and light industrial) in the Pasuruan Regency area.

Figure 6. Average daily load vs photovoltaic (PV) generation profile

This approach maintains transparency regarding data limitations while still providing a realistic approximation of local demand behavior. Although the profile does not represent actual measured consumption, it offers a credible basis for assessing how the FPV system can support daytime loads and reduce dependence on PLN grid imports.

The average daily energy demand is approximately 24,000 kWh, equivalent to an average load of about 1,000 kW and a peak of 2,576 kW. Demand is lowest in the early morning (approximately 667 kW), increases after 06:00, and reaches its maximum between 09:00 and 16:00. This pattern closely matches the peak of FPV generation, enabling a substantial portion of daytime demand to be supplied directly by solar energy.

To further assess the efficiency of the FPV system, key operational parameters have been evaluated based on simulation results from the HOMER Pro. These parameters capture the system’s conversion of solar energy into electrical output, consistent performance, and overall installed capacity utilization. It can be seen that the values reflect the 10 MW FPV plant at Lake Ranu Grati’s stable annual generation and reliable capacity factor under tropical conditions, revealing an efficient system output and resource exploitation every year. Detailed parameters are tabulated in Table 9.

Table 9. Output parameters from simulation

Parameter

Value

Description

Installed capacity

10,000 kW

Total photovoltaic (PV) system capacity

Annual generation

15.35 GWh

Electricity generated by the PV system

Capacity factor

17.5%

Utilization of installed capacity

Operating hours

4,281 h

System operating time per year

3.2 Economic Analysis

The Lake Ranu Grati 10 MW FPV was economically evaluated using the financial outcomes of HOMER Pro. CAPEX and operational expenditure are included in the model to assess the project’s long-term economic feasibility. The overall capital investment is approximately USD 12.8 million, with USD 12.0 million for the FPV array (anchoring system, floating platform, and BOS and USD 0.8 million for the inverter and conversion units—estimated yearly O&M expense of USD 165,000 for inverter and PV array maintenance. Simulation offers an NPC of USD 12.9 million and an LCOE of USD 0.053/kWh. The component cost summary of the 10 MW FPV system is presented in Table 10.

Table 10. Component cost summary of the 10 MW floating photovoltaic (FPV) system

Parameter

Value

Description

Installed capacity

10,000 kW

Total photovoltaic (PV) system capacity

Annual generation

15.35 GWh

Electricity generated by the PV system

Capacity factor

17.5%

Utilization of installed capacity

Operating hours

4,281 h

System operating time per year

They enhance the economic viability of the plant, especially under the PLN medium-voltage industrial tariff of approximately IDR 1,114.74/kWh, or USD 0.0719/kWh, with exported renewable electricity valued at 65% of this tariff ($\approx$IDR 725/kWh or USD 0.0467/kWh). Therefore, the FPV power plant generates power at a cost approximately 26% less than the grid purchase tariff, making it an economically viable renewable power source for Indonesia.

3.3 Economic Results

a. NPC

NPC represents the total cost incurred over the system’s lifetime, encompassing capital, replacement, operating, and maintenance expenses. Based on the revised simulation, the FPV system costs USD 12.9 million. This is an economic necessity in the long run to manage the 10 MW floating solar system, demonstrating that the design is economically viable even for large-scale renewable projects. HOMER sets this design as optimal to balance cost and performance over the project’s duration. The detailed economic results are summarized in Table 11.

Table 11. Economic results

Parameter

Value

Unit

Description

Net Present Cost (NPC)

12.9

million USD

Total lifetime system cost

Levelized Cost of Energy (LCOE)

0.053

USD/kWh

Average cost per unit of energy

Net Present Value (NPV)

1.9

million USD

Profit after discount rate

Internal Rate of Return (IRR)

9.2

%

Project profitability indicator

Break Even Point (BEP)

10.1

year

Time required to recover investment

Total capital expenditure (CAPEX)

12.8

million USD

Initial investment cost

Annual operation and maintenance (O&M) Cost

0.165

million USD

Yearly O&M cost

Annual Net Cash Flow

0.95

million USD

Net profit per year after O&M

Annual Energy Output

15.35

GWh

Electricity generated per year

Lifetime Energy Output

383.75

GWh

Total generation over 25 years

b. LCOE

LCOE represents the average cost incurred over the project’s duration to produce one kilowatt-hour of electricity. Simulation has yielded an LCOE value of USD 0.053/kWh, which is lower compared to the PLN medium-voltage industrial tariff of approximately IDR 1,114.74/kWh (USD 0.0719/kWh) as per the Ministry of Energy and Mineral Resources Regulation No. 28/2016 and No. 26/2021. This demonstrates that the Lake Ranu Grati FPV power plant can produce clean electricity at a cost approximately 26% lower than the grid purchase tariff, confirming its strong economic performance.

c. Net Present Value (NPV)

NPV calculates the project’s profitability as a ratio of total discounted costs to revenues. The updated simulation yields an NPV of USD 1.9 million at an 8% discount rate, again demonstrating that FPV is a profitable investment and a good return on investment throughout its operational life.

d. IRR

IRR measures profitability in relation to the initial investment. The IRR of the FPV system is 9.2%. In comparison, the assumed discount rate is 8%, a slight increase, indicating that the project remains financially profitable in real-world situations and pays investors adequately.

e. BEP

BEP is the time required to break even by recovering the original investment through net profits each year. The simulation calculates a payback period of 10.1 years, indicating that the project can recoup its capital in the first half of its 25-year project lifespan, which affirms its financial viability in the medium term.

3.4 Sensitivity Analysis

A brief sensitivity assessment was conducted to identify which input parameters in HOMER Pro exert the most decisive influence on the NPC and LCOE in Table 12. Since CAPEX constitutes the most significant portion of the project’s lifetime cost, variations in PV investment cost have the most significant impact on both NPC and LCOE. Higher CAPEX increases the annualized capital charge, thereby raising NPC and LCOE almost proportionally.

The discount rate is also a major driver of LCOE because it directly affects the capital recovery factor used in the annualized cost calculation. An increase in the discount rate results in higher annualized capital costs, leading to a notable rise in LCOE, while its impact on NPC is comparatively more minor. Meanwhile, variations in annual O&M expenses have a moderate influence, given their smaller share of lifetime costs.

Changes in solar resource availability—represented by the capacity factor—mainly influence LCOE because reduced generation spreads fixed costs over fewer kilowatt-hours. Overall, PV CAPEX and the discount rate are the most sensitive parameters, followed by O&M costs and variations in solar resources.

Table 12. Sensitivity of key input parameters on Net Present Cost (NPC) and Levelized Cost of Energy (LCOE)

Parameter

Impact on NPC

Impact on LCOE

Explanation

Photovoltaic (PV) total capital expenditure (CAPEX)

High

High

Capital cost dominates lifetime expenditure; changes directly affect annualized cost and overall project economics.

Discount rate

Moderate

High

Strong influence on the capital recovery factor used in LCOE calculation; NPC is less sensitive than LCOE.

Operation and maintenance (O&M) cost

Low–moderate

Low–moderate

A smaller portion of the total cost; variations have a limited but noticeable influence over the project’s lifetime.

Solar resource/

Capacity factor

Low

Moderate

Affects annual energy production; LCOE increases when generation decreases, while NPC remains relatively unchanged.

Inverter replacement cost

Low

Low–moderate

Replacement occurs only at specific intervals; influence is secondary compared to PV CAPEX and discount rate.

4. Discussion

The techno-economic evaluation finds that the proposed 10 MW FPV power plant at Lake Ranu Grati is economically and technically feasible. The revised simulation yields an LCOE of USD 0.053/kWh, which is significantly lower than the PLN industrial medium-voltage tariff of USD 0.0719/kWh (approximately IDR 1,114.74/kWh) applied in 2023–2024. This indicates that the FPV system remains competitive under real market conditions. The project requires an NPC of USD 12.9 million, achieves an IRR of 9.2%, and offers a payback period of about 10.1 years. At an 8% discount rate, the system yields an NPV of USD 1.9 million, demonstrating its long-term economic viability.

Despite the higher initial cost of floating structures, the system remains feasible due to strong energy output and the absence of land-use conflicts. Technically, the FPV plant can generate approximately 15.35 GWh of electricity per year, supplying a significant portion of daytime demand around the lake. Its production profile closely matches the regional load curve, helping reduce grid dependence during peak periods.

Seasonal variation in irradiance results in slightly higher generation during the dry season and lower output during the wet season. However, the system still achieves a positive net annual export, ensuring a consistent contribution to renewable energy throughout the year.

Beyond economic and technical performance, the FPV installation provides environmental and spatial co-benefits. It preserves land, reduces water evaporation, suppresses algae growth, and decreases CO2 emissions by about 11,000 tonnes per year. These advantages support the FPV system’s role in Indonesia’s clean energy transition. Overall, the 10 MW Ranu Grati FPV project stands as a robust, sustainable, and replicable model for the deployment of inland-water renewable energy.

5. Conclusion

This study demonstrates that the 10 MW FPV system at Lake Ranu Grati is technically, economically, and environmentally feasible under Indonesia’s current energy conditions. The HOMER Pro simulation results show stable annual generation of 15.35 GWh, with system output aligning well with daytime demand patterns. Although the load profile used in this study is an assumed curve based on standard Indonesian distribution load shapes, the results indicate that the FPV system can reliably support local daytime consumption and reduce dependence on PLN grid imports.

The project achieves an NPC of USD 12.9 million and an LCOE of USD 0.053/kWh, which remains below the prevailing industrial medium-voltage tariff. Financial indicators—including an NPV of USD 1.9 million, an IRR of 9.2%, and a payback period of around 10 years—confirm strong investment viability. Beyond its economic merits, the FPV installation offers additional benefits, including land-use savings, reduced water evaporation, improved panel efficiency through water-based cooling, and an estimated annual reduction of approximately 11,000 tonnes of CO2 emissions. These advantages reinforce the role of FPV technology as a strategic option to support Indonesia’s energy transition and sustainable development goals.

Overall, the Lake Ranu Grati FPV project serves as a promising and scalable model for inland-water solar deployment, demonstrating a balanced integration of technical performance, economic competitiveness, and environm-ental sustainability.

Author Contributions

Conceptualization, R. P.; methodology, R. P.; software, R. P.; validation, R. P.; formal analysis, R. P.; investigation, Rama Pujangga; resources, R. P.; data curation, R. P.; writing—original draft preparation, R. P; writing—review and editing, R. P.; visualization, M. Z. A.; supervision, R. P.; project administration, R. All authors have read and agreed to the published version of the manuscript.

Data Availability

The data used to support the research findings are available from the corresponding author upon request.

Acknowledgments

The entire research and manuscript are under the guidance and chairmanship of Dr. Singgih Dwi Prasetyo, affiliated with Power Plant Engineering Technology, State University of Malang, Malang 65145, Indonesia.

Conflicts of Interest

The authors declare no conflicts of interest.

References
1.
S. Bossi, L. Blasi, G. Cupertino, R. dell’Erba, A. Cipollini, S. De Vito, M. Santoro, G. Di Francia, and G. M. Tina, “Floating photovoltaic plant monitoring: A review of requirements and feasible technologies,” Sustainability, vol. 16, no. 19, p. 8367, 2024. [Google Scholar] [Crossref]
2.
A. Ahmed, M. Elsakka, N. Elminshawy, A. Mohamed, and S. Sundaram, “Recent advances in floating photovoltaic systems,” Chem. Rec., vol. 23, no. 12, p. e202300229, 2023. [Google Scholar] [Crossref]
3.
P. Ranjbaran, H. Yousefi, A. Gholami, and A. Sheikhi, “A review on floating photovoltaic (FPV) power generation units,” Renew. Sustain. Energy Rev., vol. 110, pp. 332–347, 2021. [Google Scholar] [Crossref]
4.
M. Abdelgaied, A. E. Kabeel, M. Zeleňáková, and H. F. Abd-Elhamid, “Floating photovoltaic plants as an effective option to reduce water evaporation in water-stressed regions and produce electricity: A case study of Lake Nasser, Egypt,” Water, vol. 15, no. 4, p. 635, 2023. [Google Scholar] [Crossref]
5.
M. A. Koondhar, L. Albasha, I. Mahariq, B. B. Graba, and E. Touti, “Reviewing floating photovoltaic (FPV) technology for solar energy,” Energy Strategy Rev., vol. 54, p. 101449, 2024. [Google Scholar] [Crossref]
6.
P. Venturini, G. G. Gagliardi, G. Agati, L. Cedola, M. V. M. Caputi, and D. Borello, “Integration of floating photovoltaic panels with an Italian hydroelectric power plant,” Energies, vol. 17, no. 4, p. 851, 2024. [Google Scholar] [Crossref]
7.
S. Gadzanku, N. Lee, and A. Dyreson, “Enabling floating solar photovoltaic (FPV) deployment: Exploring the operational benefits of floating solar-hydropower hybrids,” National Renewable Energy Lab. (NREL), Golden, CO (United States), NREL/TP-7A40-83149, 2022. [Online]. Available: https://www.nrel.gov/docs/fy22osti/83149.pdf [Google Scholar]
8.
A. Djalab, Z. Djalab, A. El Hammoumi, G. M. Tina, S. Motahhir, and A. A. Laouid, “A comprehensive review of floating photovoltaic systems: Tech advances, marine environmental influences on offshore PV systems, and economic feasibility analysis,” Sol. Energy, vol. 277, p. 112711, 2024. [Google Scholar] [Crossref]
9.
S. R. K. Soltani, A. Mostafaeipour, P. Mishra, S. Alidoost, M. Jahangiri, and M. A. Kar, “Green hydrogen production and prediction using floating photovoltaic panels on wastewater ponds,” Renew. Energy, vol. 243, p. 122554, 2025. [Google Scholar] [Crossref]
10.
R. Muthia, A. S. P. Pramudya, M. R. Maulana, and W. W. Purwanto, “Techno-economic analysis of green hydrogen production by a floating solar photovoltaic system for industrial decarbonization,” Clean Energy, vol. 8, no. 4, pp. 1–14, 2024. [Google Scholar] [Crossref]
11.
M. A. Islam, M. M. N. Ali, I. B. Benitez, S. S. Habib, T. Jamal, A. Flah, V. Blazek, and C. Z. El-Bayeh, “A comprehensive evaluation of photovoltaic simulation software: A decision-making approach using Analytic Hierarchy Process and performance analysis,” Energy Strategy Rev., vol. 58, p. 101663, 2025. [Google Scholar] [Crossref]
12.
Y. Zhou, S. Chaudhary, C. Hutton, and T. Rahman, “Techno-economic and sensitivity analysis of floating photovoltaics for river island communities in Bangladesh,” Energy Sustain. Dev., vol. 83, p. 101539, 2024. [Google Scholar] [Crossref]
13.
C. Veliathur Chinnasamy Srinivasan, P. K. Soori, and F. A. Ghaith, “Techno-economic feasibility of the use of floating solar PV systems in oil platforms,” Sustainability, vol. 16, no. 3, p. 1039, 2024. [Google Scholar] [Crossref]
14.
A. El-Maaroufi, M. Daoudi, and R. A. Laamara, “Techno-economic analysis of a PV/WT/biomass off-grid hybrid power system for rural electrification in northern Morocco using HOMER,” Renew. Energy, vol. 231, p. 120904, 2024. [Google Scholar] [Crossref]
15.
J. D. A. Dardon and H. Farzaneh, “Techno-economic analysis of a hybrid photovoltaic-wind-biomass-battery system for off-grid power in rural Guatemala,” Util. Policy, vol. 88, p. 101762, 2024. [Google Scholar] [Crossref]
16.
S. D. Prasetyo, B. B. P. Pranata, M. S. Alfaridzi, Z. Arifin, C. Harsito, M. S. Mauludin, and A. Kusumawardana, “Techno-economic assessment of solar power plants on river land in Indonesia using HOMER Pro,” J. Urban Dev. Manag., vol. 3, no. 3, pp. 164–175, 2024. [Google Scholar] [Crossref]
17.
N. M. Kumar, S. Islam, A. K. Podder, A. Selim, M. Bajaj, and S. Kamel, “Lifecycle-based feasibility indicators for floating solar photovoltaic plants along with implementable energy enhancement strategies and framework-driven assessment approaches leading to advancements in the simulation tool,” Front. Energy Res., vol. 11, p. 1075384, 2023. [Google Scholar] [Crossref]
18.
N. A. Pambudi, R. A. Firdaus, R. Rizkiana, D. K. Ulfa, M. S. Salsabila, Suharno, and Sukatiman, “Renewable energy in Indonesia: Current status, potential, and future development,” Sustainability, vol. 15, no. 3, p. 2342, 2023. [Google Scholar] [Crossref]
19.
B. P. Resosudarmo, J. F. Rezki, and Y. Effendi, “Prospects of energy transition in Indonesia,” Bull. Indones. Econ. Stud., vol. 59, no. 2, pp. 149–177, 2023. [Google Scholar] [Crossref]
20.
M. Adrian, E. P. Purnomo, A. Enrici, and T. Khairunnisa, “Energy transition towards renewable energy in Indonesia,” Herit. Sustain. Dev., vol. 5, no. 1, pp. 107–118, 2023. [Google Scholar] [Crossref]
21.
M. Yuniza, D. Salim, H. Triyana, and M. Triatmodjo, “Revisiting just energy transition in Indonesia energy transition policy,” J. World Energy Law Bus., vol. 17, no. 2, pp. 118–127, 2024. [Google Scholar] [Crossref]
22.
M. Rifansyah and D. F. Hakam, “Techno economic study of floating solar photovoltaic project in Indonesia using RETscreen,” Clean. Energy Syst., vol. 9, p. 100155, 2024. [Google Scholar] [Crossref]
23.
Y. Wei, D. Khojasteh, C. Windt, and L. Huang, “An interdisciplinary literature review of floating solar power plants,” Renew. Sustain. Energy Rev., vol. 209, p. 115094, 2025. [Google Scholar] [Crossref]
24.
G. Chowdhury, M. Haggag, and J. Poortmans, “How cool is floating PV? A state-of-the-art review of floating PV’s potential gain and computational fluid dynamics modeling to find its root cause,” EPJ Photovoltaics, vol. 14, p. 24, 2023. [Google Scholar] [Crossref]
25.
F. K. Alhousni, F. B. I. Alnaimi, P. C. Okonkwo, I. Ben Belgacem, H. Mohamed, and E. M. Barhoumi, “Photovoltaic power prediction using analytical models and HOMER-Pro: Investigation of results reliability,” Sustainability, vol. 15, no. 11, p. 8904, 2023. [Google Scholar] [Crossref]
26.
C. Vargas-Salgado, D. Díaz-Bello, D. Alfonso-Solar, and F. Lara-Vargas, “Validations of HOMER and SAM tools in predicting energy flows and economic analysis for renewable systems: Comparison to a real-world system result,” Sustain. Energy Technol. Assess., vol. 69, p. 103896, 2024. [Google Scholar] [Crossref]
27.
O. A. Odetoye, P. K. Olulope, O. M. Olanrewaju, A. O. Alimi, and O. G. Igbinosa, “Multi-year techno-economic assessment of proposed zero-emission hybrid community microgrid in Nigeria using HOMER,” Heliyon, vol. 9, no. 9, p. e19189, 2023. [Google Scholar] [Crossref]
28.
F. Mandys, M. Chitnis, and S. R. P. Silva, “Levelized cost estimates of solar photovoltaic electricity in the United Kingdom until 2035,” Patterns, vol. 4, no. 5, p. 100735, 2023. [Google Scholar] [Crossref]
29.
I. Esparza, Á. Olábarri Candela, L. Huang, Y. Yang, C. Budiono, S. Riyadi, W. Hetharia, R. Hantoro, D. Setyawan, I. K. A. P. Utama, and et al., “Floating PV systems as an alternative power source: Case study on three representative islands of Indonesia,” Sustainability, vol. 16, no. 3, p. 1345, 2024. [Google Scholar] [Crossref]
30.
A. Mdallal, A. Yasin, M. Mahmoud, M. A. Abdelkareem, A. H. Alami, and A. G. Olabi, “A comprehensive review on solar photovoltaics: Navigating generational shifts, innovations, and sustainability,” Sustain. Horiz., vol. 13, p. 100137, 2025. [Google Scholar] [Crossref]
31.
U. Pfeifroth, J. Drücke, S. Kothe, J. Trentmann, M. Schröder, and R. Hollmann, “SARAH-3–satellite-based climate data records of surface solar radiation,” Earth Syst. Sci. Data, vol. 16, no. 11, pp. 5243–5265, 2024. [Google Scholar] [Crossref]
32.
K. Wang, Y. Y. Da, H. R. Bi, Y. H. Liu, B. Q. Chen, M. Wang, Z. H. Liu, J. Nielsen, and T. W. Tan, “A one-carbon chemicals conversion strategy to produce precursor of biofuels with Saccharomyces cerevisiae,” Renew. Energy, vol. 208, pp. 331–340, 2023. [Google Scholar] [Crossref]
33.
Y. B. Jin, S. J. Hu, A. D. Ziegler, L. Gibson, J. E. Campbell, R. R. Xu, D. L. Chen, K. Zhu, Y. Zhen, and B. Ye, “Energy production and water savings from floating solar photovoltaics on global reservoirs,” Nat. Sustain., vol. 6, pp. 865–874, 2023. [Google Scholar] [Crossref]
34.
C. Ferrer-Gisbert, J. J. Ferrán-Gozálvez, M. Redón-Santafé, P. Ferrer-Gisbert, F. J. Sánchez-Romero, and J. B. Torregrosa-Soler, “A new photovoltaic floating cover system for water reservoirs,” Renew. Energy, vol. 60, pp. 63–70, 2013. [Google Scholar] [Crossref]
35.
A. Sahu, N. Yadav, and K. Sudhakar, “Floating photovoltaic power plant: A review,” Renew. Sustain. Energy Rev., vol. 66, pp. 815–824, 2016. [Google Scholar] [Crossref]
36.
N. H. Nguyen, B. C. Le, and T. T. Bui, “Benefit analysis of grid-connected floating photovoltaic system on the hydropower reservoir,” Appl. Sci., vol. 13, no. 5, p. 2948, 2023. [Google Scholar] [Crossref]
37.
A. Ghigo, E. Faraggiana, M. Sirigu, G. Mattiazzo, and G. Bracco, “Design and analysis of a floating photovoltaic system for offshore installation: The case study of Lampedusa,” Energies, vol. 15, no. 23, p. 8804, 2022. [Google Scholar] [Crossref]
38.
G. Kakoulaki, R. Gonzalez Sanchez, A. Gracia Amillo, S. Szabó, M. De Felice, F. Farinosi, L. De Felice, B. Bisselink, R. Seliger, I. Kougias, and A. Jaeger-Waldau, “Benefits of pairing floating solar photovoltaics with hydropower reservoirs in Europe,” Renew. Sustain. Energy Rev., vol. 171, p. 112989, 2023. [Google Scholar] [Crossref]
39.
Ministry of Energy and Mineral Resources of the Republic of Indonesia, “Regulation of the Minister of Energy and Mineral Resources No. 7 of 2024 on Electricity Tariffs Provided by PT PLN (Persero),” Jakarta, Indonesia, 2024. [Online]. Available: https://jdih.esdm.go.id/dokumen/download?id=Permen+ESDM+Nomor+7+Tahun+2024.pdf [Google Scholar]
40.
Ministry of Energy and Mineral Resources of the Republic of Indonesia, “Ministerial Regulation No. 49 of 2018 on the Use of Rooftop Solar Power Systems by PLN Consumers,” Jakarta, Indonesia, 2018. [Online]. Available: https://peraturan.bpk.go.id/Home/Download/133718/Permen%20ESDM%20Nomor%2049%20Tahun%202018.pdf [Google Scholar]

Cite this:
APA Style
IEEE Style
BibTex Style
MLA Style
Chicago Style
GB-T-7714-2015
Pujangga, R & Apriliyansah, M. Z. (2025). Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study. J. Sustain. Energy, 4(2), 174-188. https://doi.org/10.56578/jse040204
R. Pujangga and M. Z. Apriliyansah, "Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study," J. Sustain. Energy, vol. 4, no. 2, pp. 174-188, 2025. https://doi.org/10.56578/jse040204
@research-article{Pujangga2025Techno-EconomicAO,
title={Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study},
author={Rama Pujangga and Mukhammad Zaidan Apriliyansah},
journal={Journal of Sustainability for Energy},
year={2025},
page={174-188},
doi={https://doi.org/10.56578/jse040204}
}
Rama Pujangga, et al. "Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study." Journal of Sustainability for Energy, v 4, pp 174-188. doi: https://doi.org/10.56578/jse040204
Rama Pujangga and Mukhammad Zaidan Apriliyansah. "Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study." Journal of Sustainability for Energy, 4, (2025): 174-188. doi: https://doi.org/10.56578/jse040204
PUJANGGA R, APRILIYANSAH M Z. Techno-Economic Analysis of a 10 MW Floating Solar Photovoltaic System on Ranu Grati Lake: A HOMER Simulation Study[J]. Journal of Sustainability for Energy, 2025, 4(2): 174-188. https://doi.org/10.56578/jse040204
cc
©2025 by the author(s). Published by Acadlore Publishing Services Limited, Hong Kong. This article is available for free download and can be reused and cited, provided that the original published version is credited, under the CC BY 4.0 license.