Javascript is required
Search

Acadlore takes over the publication of IJEPM from 2025 Vol. 10, No. 3. The preceding volumes were published under a CC BY 4.0 license by the previous owner, and displayed here as agreed between Acadlore and the previous owner. ✯ : This issue/volume is not published by Acadlore.

Open Access
Research article

Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities

Evgenii Leontev,
Yulia Leontyeva,
Igor Mayburov
Ural Federal University, Ekaterinburg, Russia
International Journal of Energy Production and Management
|
Volume 6, Issue 4, 2021
|
Pages 359-370
Received: N/A,
Revised: N/A,
Accepted: N/A,
Available online: N/A
View Full Article|Download PDF

Abstract:

Cities in Russia are faced with a burning problem of procuring funds for public transit and transport infrastructure projects. The article aims to evaluate the possibility of using Tax Increment Financing (TIF) in various cities of Russia by calculating property tax revenue increments from a TIF project and designating the increments as a protected source of funds for recouping investments in the project. The authors proceed from a hypothesis that it is possible to justify the priority of the city’s fiscal capacity for TIF adoption over its land area and the size of its population. The study analyzes a major TIF project that was implemented in the field of public transportation. The outcomes of the project were extrapolated to transport projects in other cities in Russia. Calculations show that the majority of the cities included in the study fit the criteria for TIF projects. The study proves that calculating the projected costs of TIF-funded projects for the development of electric public transport enables the grouping of the cities by potential for TIF project implementation. At the same time, other characteristics of cities, such as the size of population, are not the determinants of such potential. The valuation of TIF potential could serve as a basis for a rapid feasibility study of a TIF project in a city, removing the need for laborious calculations.

Keywords: electric public transport, property tax, tax base, tax increment, tax increment financing, TIF project


Cite this:
APA Style
IEEE Style
BibTex Style
MLA Style
Chicago Style
GB-T-7714-2015
Leontev, E., Leontyeva, Y., & Mayburov, I. (2021). Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities. Int. J. Energy Prod. Manag., 6(4), 359-370. https://doi.org/10.2495/EQ-V6-N4-359-370
E. Leontev, Y. Leontyeva, and I. Mayburov, "Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities," Int. J. Energy Prod. Manag., vol. 6, no. 4, pp. 359-370, 2021. https://doi.org/10.2495/EQ-V6-N4-359-370
@research-article{Leontev2021AnalysisOC,
title={Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities},
author={Evgenii Leontev and Yulia Leontyeva and Igor Mayburov},
journal={International Journal of Energy Production and Management},
year={2021},
page={359-370},
doi={https://doi.org/10.2495/EQ-V6-N4-359-370}
}
Evgenii Leontev, et al. "Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities." International Journal of Energy Production and Management, v 6, pp 359-370. doi: https://doi.org/10.2495/EQ-V6-N4-359-370
Evgenii Leontev, Yulia Leontyeva and Igor Mayburov. "Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities." International Journal of Energy Production and Management, 6, (2021): 359-370. doi: https://doi.org/10.2495/EQ-V6-N4-359-370
LEONTEV E, LEONTYEVA Y, MAYBUROV I. Analysis of Capacity for Implementation of TIF Projects for Electric Transport Development in Russian Cities[J]. International Journal of Energy Production and Management, 2021, 6(4): 359-370. https://doi.org/10.2495/EQ-V6-N4-359-370