[1] Norsk Petroleum, https://www.norskpetroleum.no/en/facts/field/troll/
[2] NRK Rogaland, https://www.nrk.no/rogaland/trollfeltet-skal-levere-gass-til-2050-1. 14329706 (accessed 7 December 2018).
[3] Hannevik, M.B., Lone, A., Bjørklund, R., Bjørkli, C.A. & Hoff, T., Organizational climate in large-scale projects in the oil and gas industry: A competing values perspective. International Journal of Project Management, 32(4), pp. 687–697, May 2014. [Crossref] [4] Williams, T., Klakegg, J., Walker, D.H., Andersen, B. & Magnussen, O.M., Identifying and acting on early warning signs in complex projects. Project Management Journal, 43(2), pp. 37–53, April 2012. [Crossref] [5] Haji-Kazemi, S., Andersen, O. & Klakegg, J., Barriers against effective responses to early warning signs in projects. International Journal of Project Management, 33(5), pp. 1068–1083, July 2015. [Crossref] [6] Vinten, G., Whistleblowing towards disaster prevention and management. Disaster Prevention and Management: An International Journal, 9(1), pp. 18–28, 2000. [Crossref] [7] Vaughan, D., The Challenger Launch Decision: Risky Technology, Culture, and Deviance at NASA, Chicago University Press, 1996
[8] The Deepwater Horizon Study Group (under the leadership of professor R.G. Bea), Investigation of the Macondo Well Blowout Disaster, University of California at Berkeley, USA, 2011.
[9] Volden, A., Senior Field Development Engineer, Statoil. Private Communication.
[10] G udmestad, O.T. & Coker, J.W.A., The sleipner a platform, an efficient gas and condensate installation. Proc. European Petroleum Conference, Europec 88, pp. 111–126, London, October 1988.
[11] H uslid, J.M. & Gudmestad, O.T., The troll platform project, Proc. Int. Congress Major Engineering Projects in the World, pp. 87–104, Nice, June, 1988.
[12] Skjæveland, H., Knudsen, A. & Nyborg, A., Technical challenges in the design and construction of the troll gravity base structure. Proceedings of ISOPE, 1-94-302, Osaka, 1994.
[13] Kumar, A. & Kim, C.H., Ringing of heidrun tlp in high and steep random wave. International Journal of Offshore and Polar Engineering, 12(3), 2002.
[14] F altinsen, O.M., Newman, J.N. & Vinje, T., Nonlinear wave loads on a slender vertical cylinder. Journal of Fluid Mechanics, 289, pp. 179–198, 25 April 1995. [Crossref] [15] H ellevik, K. & Gudmestad, O.T., Limit cycle oscillations at resonances for systems subjected to nonlinear damping or external forces. Journal of Physics: Conference Series (JPCS), 2017.
[16] G undersen, N.G., Platform Manager at the Draugen Platform During a “Ringing” Event in March 1995, Private communication.
[17] J akobsen, B., & Rosendal, F., The sleipner platform accident. Structural Engineering International, 4(3), pp. 190–193, August 1994. [Crossref] [18] Trbojevic, V.M., Bellamy, L.J., Brabazon, P.G., Gudmestad, O.T. & Rettedal, W.K., Methodology for the analysis of risks during the construction and installation phases of an offshore platform. special issue: “Safety on offshore process installation: North Sea.”Journal of Loss Prevention in the Process Industries, 7(4), pp. 350–359, 1994. [Crossref] [19] Trbojevic, V.M., Ballamy, L.J., Gudmestad, O.T., Aarum, T. & Rettedal, W.K., Assessment of risk in the design phase of an offshore project. Proc. OMAE 96’ - Vol. II. Safety and Reliability, pp. 431–435, 1996.
[20] L akats, L., Gudmestad, O.T., Skjæveland, H., Rettedal, W. & Gausel, E., Managing Offshore platform construction taking into account “bad news.” A case study. Paper WAO6.4 Presented at Institute for Operations Research and the Management Sciences, National Meeting, Montreal, Quebec, https://www.researchgate.net/publication/313553887_Managing_Offshore_platform_construction_taking_into_account_bad_news_A_case_study (accessed 26–29 April 1998).
[21] L akats, L.M., Organizational warnings and system safety: designing for the communication of bad news. Doctoral Dissertation, Department of Industrial Engineering and Engineering Management, Stanford University, USA, 1997.
[22] Wasserman, S. & Faust, K., Social Network Analysis: Methods and Applications, Cambridge University Press, New York, 1994.
[23] Pate-Cornell. M.E. & Fischbeck, P.S., Safety of the thermal protection system of the space shuttle orbiter: quantitative analysis and organizational factors, Report to The National Aeronautics and Space Administration, December, 1990.
[24] Pate-Cornell, M.E. & Rettedal, W.K., Management of resource, constraints and system safety: application to the design and construction of concrete offshore platforms. Presentedat ISOPE 97, Honolulu, July 1997.
[25] G udmestad, O.T., Treatment of “bad news” in a project, Proceedings of the 24th Int. Congress on Condition Monitoring and diagnostics Engineering management, ISBN 09541307-2-2, pp. 1035–1041, Stavanger, June 2011.