[1] A Study on Energy Management Program in KOC, 2011.
[2] ISO 50001:2011 Energy Management System (EnMS).
[3] Related Standards and Guidelines on Energy Conservation Code in Buildings by (Min- istry of Energy (MoE), Kuwait.
[4] State of Kuwait State of Kuwait is a signatory to COP#21 wherein it has committed to reduce the impact on environment by reducing the GHG emissions.
[5] Energy Conservation & Demand Management Plan 2014 – 2019 Technical Report – OAKVILLE.
[6] Energy Efficiency Reference for Environmental Reviewers, March 2010 – EPA Publi- cation No. 315-R-09-001.
[7] Bhattacharyya, S.C., Energy data and energy balance. Energy Economics, Springer- Verlag, London, 2011. [Crossref]
[8] Kaneda, D., Jacobson, B. & Rumsey, P., Plug oad Reduction: The Next Big Hurdle for Net Zero Energy Building Design. ACEEE Summer Study on Energy Efficiency in Buildings; 2010.
[9] Menezes, A., Cripps, A., Bouchlaghem, D. & Buswell, R., Analysis of electricity con- sumption for lighting and small power in office buildings, CIBSE Technical Sympo- sium, 6th–7th September, DeMontfort University, Leicester, UK, 2011.
[10] IPIECA, Climate Change 2013 – “Saving energy in the oil and gas industry”, 2013. Available at: www.ipieca.org.
[11] LEED rating system. Available at: http://www.usgbc.org/leed.
Search

Acadlore takes over the publication of IJEPM from 2025 Vol. 10, No. 3. The preceding volumes were published under a CC BY 4.0 license by the previous owner, and displayed here as agreed between Acadlore and the previous owner. ✯ : This issue/volume is not published by Acadlore.

Open Access
Research article

Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study

yousef e. al-qallaf,
fatima owayed,
parisudda rao
Health & Environment Team, KOC, Kuwait
International Journal of Energy Production and Management
|
Volume 2, Issue 4, 2017
|
Pages 352-359
Received: N/A,
Revised: N/A,
Accepted: N/A,
Available online: 11-29-2017
View Full Article|Download PDF

Abstract:

Effective energy management involves making decisions that lead to the conservation of energy and the efficient use of resources for sustainable future. Kuwait Oil Company (KOC), a subsidiary of Kuwait Petroleum Corporation (KPC), is involved in exploration, drilling and production of oil and gas. KOC is fully committed towards energy management, energy efficiency and greenhouse gases (GHGs) emissions reduction, which may help in minimizing energy costs and mitigating environmental effects. In order to meet national and international standards ISO 50001 Energy Management System (EnMS), KOC undertaken a pilot study for developing an effective energy management program for KOC representative process units and main buildings. The objective of the program was to create an energy baseline and identify the potential improvement areas and provide inputs for the implementation of ISO50001 for certification. KOC has established the Energy Performance Indicators (EnPIs) for each of the process units and specific KPIs has been identified to monitor and control the energy performance. Furthermore, the study highlights the major achievements towards energy management, energy efficiency and greenhouse gas (GHGs) emissions reduction in order to help in minimizing energy costs and mitigating environmental effects.

Keywords: Energy baseline, Energy cost & energy saving best practices, EnPIs, ISO EnMS

1. Introduction

The systemic waste of natural resources in the Gulf is eroding economic resilience to shocks and increasing security risks. The six Gulf Cooperation Council (GCC) countries now consume more primary energy than the whole of Africa. Almost $100 \%$ of energy is produced from oil and gas without carbon dioxide abatement. If the region's fuel demand were to continue rising as it has over the last decade, it would double by 2024 .

This is a deeply undesirable prospect for both the national security of each state and the global environment. KOC was established in 1934, is one of the largest oil exporter in the world, headquartered in Ahmadi, Kuwait. The Company activities had extended to include exploration operations, on-shore and offshore surveys, drilling of test wells, and developing of producing fields in addition to crude and natural gas exploration.

KOC undertaken a pilot study consisting of three process units and two main buildings. The task was to create an energy baseline & identify the potential energy saving opportunities.

All energy sources have been considered in the study and wherever the data was available have been analyzed for performance and the opportunities in the five selected pilot sites. They have conducted a detailed study after site visits and interactions with the process owners and identified the potential areas for improvement with recommendation. The selected pilot sites are mentioned below [1].

  • Gathering Center (GC-04)

  • Booster Station (BS-160)

  • Effluent Water Disposable Plant (EWDP – II)

  • KOC Main Office Building

  • KOC New Office Complex Building (B1)

The program was developed in accordance with national and internal standards ISO 50001:2011 Energy Management System (EnMS) Requirements [2]. KOC has already appointed a Management Representative, Core energy management team to guide and take forward the energy improvement activities. Energy Policy has been defined. Training on ISO 50001 awareness has been provided to the employees & contractors.

2. Methodology

3. Compliance to Legal & Other Requirements

The study was comply with national and international regulations on energy conservation code for buildings [3]. Further, the State of Kuwait State of Kuwait is a signatory to COP#21 wherein it has committed to reduce the impact on environment by reducing the greenhouse gases [4]. To achieve this KOC has to reduce its burning of fossil fuel.

4. Baseline

Based on the data made available, the baseline for all the five pilot sites have been made and analyzed. The data period has been considered from Oct'2013 to Mar'2015 (18 months period). The Target for each site has been derived using the six-sigma concept considering a confidence level of 70%. Energy Conservation Plan that has been identified [5] is addressed in the Energy savings and cost effective opportunities.

Figure 1. Different phases for energy management program
Table 1. Baseline data including Energy Performance Indicators (EnPIs)

Baseline

Estimated

S.No

Pilot Site

(Oct’13 - Mar’15)

EnPI

Energy Savings %

1

GC 04

Electrical

613.5

kWh/MBOE

15.2

Thermal

12934.5

SCF/MBOE

7.0

Overall energy Equivalent

3684

MkCal/MBOE

7.7

2

BS 160

Electrical

1118.7

kWh/MBOE

20.7

Thermal

4037.4

MSCF/MBOE

3.5

Overall energy Equivalent

986.1

MMkCal/MBOE

3.5

3

EWDP II

Electrical

0.413

kWh/BBLS

5.7

Thermal

0.501

SCF/BBLS

10.8

Overall energy Equivalent

0.477

MkCal/BBLS

4.2

4

Main Office Building

Winter

2.47

kWh/m2/day

4.98

Summer

2.90

kWh/m2/day

6.25

5

New Office Complex

Winter

0.39

kWh/m2/day

11.1

Summer

1.09

kWh/m2/day

12.3

4.1 Identification of Areas of Significant Energy Use (GC-04)

Significant energy use refers to energy use accounting for substantial energy consumption and/or offering considerable potential for energy performance improvement. In line with this, significant energy use equipment/processes were identified based on the electrical load data furnished for GC-04. The share of total connected load of equipment & machineries, which are presently operated are depicted below to understand and highlight the significant power consumers [6].

4.2 Identification of Areas of Significant Energy Use (BS-160)

Significant energy use refers to energy use accounting for substantial energy consumption and/or offering considerable potential for energy performance improvement. In line with this, significant energy use equipment/processes were identified based on the electrical load data furnished for BS - 160 [7]. The share of total energy use is evolved to understand the contribution of thermal energy (fuel gas) and electrical energy in the day-to-day operations of BS 160 is depicted in figure below.

4.3 Identification of Areas of Significant Energy Use (EWDP-II)

The thermal energy is used only in sludge separators and rest of other systems utilizes electrical energy and majority of them are motor driven equipment. The share of total connected load of equipment & machineries, which are presently operated are depicted to understand and highlight the significant power guzzlers.

Figure 2. Significant Energy Consumption for GC-04
Figure 3. Significant Energy Consumption for BS-160
4.4 Identification of Areas of Significant Energy Use (Main Office Building)

Significant energy use equipment/processes were identified based on the electrical load data furnished for main office building. The share of total connected load of electrical equipment & machineries.

4.5 Identification of Areas of Significant Energy Use (New Office Complex)

The major variables affecting the energy use for new office complex has identified based on observations, analysis and understanding of process operations and energy utilization [8].

Further the trend for electricity consumption vs ambient temperature is evolved for the baseline period to visualize the impact of climatic variations on electricity as depicted in the below [9].

Figure 4. Significant Energy Consumption for EWDP-II
Figure 5. Significant Energy Consumption for Main Office Building
Figure 6. Significant Energy Consumption Vs Temperature at New Office Complex

5. Energy Saving Opportunities

The site-specific observations comprises identification of significant energy use discussed above and existing & identified energy savings opportunities are summarized for all five pilot sites in below table [10].

6. Conclusion

The company should creating baseline for other process units, in order to monitor and verify the energy performance. Further, metering & sub metering system for electrical and thermal where not available, be provided on priority. (Energy meters and Flow meters). A comprehensive investment grade energy audit (IGA) should be conducted to for each process site and buildings for capturing the individual equipment performance and identify the losses and pin point energy conservation opportunities and also Carry out Testing, Adjusting and Balancing (TAB) for the HVAC system for the buildings to improve the chiller efficiency and performance.

Additionally, increase the use of renewable and clean energy technologies such as Solar PV in office buildings (use of Solar PV for lighting load in main & new office buildings to replace the conventional power source), Solar Thermal technologies in process heating and use of LNG instead of fossil fuel based electricity. For the Green building concept, KOC needs to get certified to ISO 50001 and then follow the LEED reference guide for Building Design & Construction v4 [11].

Table 2. Existing and Identified Energy Saving Opportunities

S.No

Pilot Site

Existing Energy Savings Opportunities

Identified Energy Saving Opportunities

1

GC 04

Running Gas engine/turbine for Tank Vapor compressors instead of motors

  1. Review and optimize the sizing of Pumps and loading and unloading of compressors.

  2. Installing VFD based on Process demands.

  3. Rectify Leakages of utilities.

  4. Monitoring use of Energy with Meters

  5. Optimizing loading on motors.

  6. Monitor Carbon and water foot print in all process areas

  7. Optimize transformer losses

  8. Use LED instead of conventional lamps

  9. HVAC usage and control

2

BS 160

Utilization of Energy Efficient Gas Turbine in gas compres- sion process

3

EWDP II

Use of metering & monitoring mechanisms for the electrical equipment

4

Main Office Building

  1. LED Replacement

  2. Switching off office loads (computers, lights, AC units etc.) When office is not occupied.

  3. VFD pump sets are installed to modulate chilled water flow.

  4. Water saving devices are installed on all taps.

  1. Insulate all cold lines and vessels

  2. Optimize Insulation thickness and material

  3. Optomize air volumes with false ceiling and segregation of areas

  4. Usage of Air curtains

  5. Minimize roof heating loads with roof cooling and roof painting

  6. Precooling of fresh air with air to air heat exchangers

  7. Optimize thermostat settings

  8. Regular maintenance of A/C and Refrigeration

  9. Minimize part load operations

5

New Office Complex

Data Availability

The data used to support the findings of this study are available from the corresponding author upon request.

Conflicts of Interest

The authors declare that they have no conflicts of interest.

References
[1] A Study on Energy Management Program in KOC, 2011.
[2] ISO 50001:2011 Energy Management System (EnMS).
[3] Related Standards and Guidelines on Energy Conservation Code in Buildings by (Min- istry of Energy (MoE), Kuwait.
[4] State of Kuwait State of Kuwait is a signatory to COP#21 wherein it has committed to reduce the impact on environment by reducing the GHG emissions.
[5] Energy Conservation & Demand Management Plan 2014 – 2019 Technical Report – OAKVILLE.
[6] Energy Efficiency Reference for Environmental Reviewers, March 2010 – EPA Publi- cation No. 315-R-09-001.
[7] Bhattacharyya, S.C., Energy data and energy balance. Energy Economics, Springer- Verlag, London, 2011. [Crossref]
[8] Kaneda, D., Jacobson, B. & Rumsey, P., Plug oad Reduction: The Next Big Hurdle for Net Zero Energy Building Design. ACEEE Summer Study on Energy Efficiency in Buildings; 2010.
[9] Menezes, A., Cripps, A., Bouchlaghem, D. & Buswell, R., Analysis of electricity con- sumption for lighting and small power in office buildings, CIBSE Technical Sympo- sium, 6th–7th September, DeMontfort University, Leicester, UK, 2011.
[10] IPIECA, Climate Change 2013 – “Saving energy in the oil and gas industry”, 2013. Available at: www.ipieca.org.
[11] LEED rating system. Available at: http://www.usgbc.org/leed.
Nomenclature

KOC – Kuwait Oil Company

KPC – Kuwait Petroleum Corporation GHGs – Greenhouse Gases

EnMS – Energy Management System COP – Conference of Parties

GC- Gathering Center BS – Booster Station

EWDP – Effluent Water Disposal Plant EnPI – Energy Performance Indicator GCC - Gulf Cooperation Council

LED – Light-Emitting Diode VFD – Variable Frequency Drive

IGA - Investment Grade Energy Audit

HVAC – Heating Ventilation Air Conditioning System TAB - Testing, Adjusting and Balancing

LNG – Liquefied Natural Gas

LEED - Leadership in Energy and Environmental Design


Cite this:
APA Style
IEEE Style
BibTex Style
MLA Style
Chicago Style
GB-T-7714-2015
Al-qallaf, Y. E., Owayed, F., & Rao, P. (2017). Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study. Int. J. Energy Prod. Manag., 2(4), 352-359. https://doi.org/10.2495/EQ-V2-N4-352-359
Y. E. Al-qallaf, F. Owayed, and P. Rao, "Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study," Int. J. Energy Prod. Manag., vol. 2, no. 4, pp. 352-359, 2017. https://doi.org/10.2495/EQ-V2-N4-352-359
@research-article{Al-qallaf2017EfficientEM,
title={Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study},
author={Yousef E. Al-Qallaf and Fatima Owayed and Parisudda Rao},
journal={International Journal of Energy Production and Management},
year={2017},
page={352-359},
doi={https://doi.org/10.2495/EQ-V2-N4-352-359}
}
Yousef E. Al-Qallaf, et al. "Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study." International Journal of Energy Production and Management, v 2, pp 352-359. doi: https://doi.org/10.2495/EQ-V2-N4-352-359
Yousef E. Al-Qallaf, Fatima Owayed and Parisudda Rao. "Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study." International Journal of Energy Production and Management, 2, (2017): 352-359. doi: https://doi.org/10.2495/EQ-V2-N4-352-359
AL-QALLAF YE, OWAYED F, RAO P. Efficient Energy Management System at Kuwait Oil Company, Kuwait, a CASE Study[J]. International Journal of Energy Production and Management, 2017, 2(4): 352-359. https://doi.org/10.2495/EQ-V2-N4-352-359