Javascript is required
[1] Department of the Army, US Army Corps of Engineers (USACE), Engineering Manual N° 1110-2-1701, “Engineering and Design, Hydropower”, 31 Dec 1985 and 5 June 1989.
[2] Maher, K.M., Potential Use of Real-time Information for Flood Operation Rules for Folsom Reservoir, MSc Thesis, University of California, Davis, 2011.
[3] Alemu, E.T., Palmer, R.N., Polebitski, A. & Meaker, B., Decision support system for optimizing reservoir operations using ensemble streamflow predictions. Journal of Water Resources Planning and Management, American Society of Civil Engineers, Jan/ Feb 2011.
[4] Jaafar, H.H., Maximizing hydropower production from reservoirs: the case study of markaba. Lebanese Science Journal, 15, (2), 2014.
[5] Columbia River Mainstem Storage Options, Off-Channel Storage Assessment Pre-Appraisal Report, prepared for the U.S. Bureau of Reclamation by MWH, Dec 2005.
[6] U.S. Bureau of Reclamation, Technical Report No. SRH-2012-06: “Franklin D. Roosevelt Lake - Grand Coulee Dam 2010-11 Survey”, June 2012, prepared by Donald L. Ferrari.
[7] Dozier, A., Integrated Water and Power Modeling Framework for Renewable Energy Integration, MSc Thesis, Colorado State University, 2012.
[8] U.S. Department of the Interior, Bureau of Reclamation, a Water Resources Technical Publication, Engineering Monograph N° 20, Selecting Hydraulic Reaction Turbines, 1976.
Search

Acadlore takes over the publication of IJEPM from 2025 Vol. 10, No. 3. The preceding volumes were published under a CC BY 4.0 license by the previous owner, and displayed here as agreed between Acadlore and the previous owner. ✯ : This issue/volume is not published by Acadlore.

Open Access
Research article

Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation

horacio l. velasco
Director, CALTEC, S.C.
International Journal of Energy Production and Management
|
Volume 2, Issue 1, 2017
|
Pages 81-94
Received: N/A,
Revised: N/A,
Accepted: N/A,
Available online: N/A
View Full Article|Download PDF

Abstract:

A new 2-Parameter Rule Curve (patent pending) for Hydropower Generation takes into account the current state of the system, represented by the beginning-of-month reservoir level, in the selection of the end-of-month Rule Curve level/storage. Thus, the two decision parameters are current time and reservoir level. The Rule Curve aims to preserve the firm energy, and to generate as much secondary energy as possible; and is based on the maximum monthly value of a composite parameter related to the variation of the potential energy stored in the reservoir, calculated for every month in the backward simulation that gives the Firm Energy Yield of the reservoir-power plant system. The Rule Curve levels are calculated to give the required end-of-month level for each month as a function of the beginning-of-month level, can be represented in tabular (matrix) and graphical forms, and can be used alone or combined with the Rule Curve proposed by the USACE (1985 and 1989), whose only parameter is current time. The use of this new 2-Parameter Rule Curve for single reservoirs can increase the annual average/secondary energy output without reducing the firm energy, as tested by the simulation of several hydropower developments; the results show an increase of average/secondary energy when compared with the USACE Rule Curve. Energy increase depends on net head variability, regulating capacity of the reservoir and power-plant-rated capacity. A 50-year simulation of Grand Coulee Dam gives an average energy output of 22.6 TW-h/year year with the 2 -Parameter Rule Curve, and 20.9 TW-h/year with the USACE Rule Curve. The increase in average/secondary energy is 1.7 TW-h/yearr, due only to the change of the Rule Curve. Data published by the USBR indicates an average output of 21 TW-h/year for Grand Coulee Dam, which confirms the simulated results.

Keywords: Hydropower, Potential energy, Reservoirs, Rule curve, Simulation

1. Introduction

2. Estimation of the 2-Parameter Rule Curve

3. Combination of the 2-Parameter and Usace Rule Curves

4. Application to Grand Coulee Dam

5. Closing Remarks

References
[1] Department of the Army, US Army Corps of Engineers (USACE), Engineering Manual N° 1110-2-1701, “Engineering and Design, Hydropower”, 31 Dec 1985 and 5 June 1989.
[2] Maher, K.M., Potential Use of Real-time Information for Flood Operation Rules for Folsom Reservoir, MSc Thesis, University of California, Davis, 2011.
[3] Alemu, E.T., Palmer, R.N., Polebitski, A. & Meaker, B., Decision support system for optimizing reservoir operations using ensemble streamflow predictions. Journal of Water Resources Planning and Management, American Society of Civil Engineers, Jan/ Feb 2011.
[4] Jaafar, H.H., Maximizing hydropower production from reservoirs: the case study of markaba. Lebanese Science Journal, 15, (2), 2014.
[5] Columbia River Mainstem Storage Options, Off-Channel Storage Assessment Pre-Appraisal Report, prepared for the U.S. Bureau of Reclamation by MWH, Dec 2005.
[6] U.S. Bureau of Reclamation, Technical Report No. SRH-2012-06: “Franklin D. Roosevelt Lake - Grand Coulee Dam 2010-11 Survey”, June 2012, prepared by Donald L. Ferrari.
[7] Dozier, A., Integrated Water and Power Modeling Framework for Renewable Energy Integration, MSc Thesis, Colorado State University, 2012.
[8] U.S. Department of the Interior, Bureau of Reclamation, a Water Resources Technical Publication, Engineering Monograph N° 20, Selecting Hydraulic Reaction Turbines, 1976.

Cite this:
APA Style
IEEE Style
BibTex Style
MLA Style
Chicago Style
GB-T-7714-2015
Velasco, H.L. (2017). Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation. Int. J. Energy Prod. Manag., 2(1), 81-94. https://doi.org/10.2495/EQ-V2-N1-81-94
H.L. Velasco, "Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation," Int. J. Energy Prod. Manag., vol. 2, no. 1, pp. 81-94, 2017. https://doi.org/10.2495/EQ-V2-N1-81-94
@research-article{Velasco2017EnergyIB,
title={Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation},
author={Horacio L. Velasco},
journal={International Journal of Energy Production and Management},
year={2017},
page={81-94},
doi={https://doi.org/10.2495/EQ-V2-N1-81-94}
}
Horacio L. Velasco, et al. "Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation." International Journal of Energy Production and Management, v 2, pp 81-94. doi: https://doi.org/10.2495/EQ-V2-N1-81-94
Horacio L. Velasco. "Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation." International Journal of Energy Production and Management, 2, (2017): 81-94. doi: https://doi.org/10.2495/EQ-V2-N1-81-94
VELASCO H L. Energy Increase by Use of a 2-Parameter Rule Curve for Hydropower Generation[J]. International Journal of Energy Production and Management, 2017, 2(1): 81-94. https://doi.org/10.2495/EQ-V2-N1-81-94