[1] Hussain, M., Climate change impact on water resources availability and hydropower production in Sarawak, Malaysia: Universiti Tecknologi Petronas, Malaysia, 2018.
[2] Ling, T.Y., Soo, C.L., Sivalingam, J.R., Nyanti, L, Sim, S.F., Grinang, J., Assessment of the Water and Sediment Quality of Tropical Forest Streams in Upper Reaches of the Baleh River, Sarawak, Malaysia, Subjected to Logging Activities. Journal of Chemistry, 2016, 8503931, 2016.
[3] Chin, J., Yusof, W., Hussain, M., Estimation of frequent peak flood discharge for the upper Rajang river basin in Sarawak, Malaysia. WIT Transactions on the Built Environment: WIT Press, p. 8, 99–106, 2020.
[4] Wang, Z., Lai, C., Chen, X., Yang, B., Zhao, S., Bai, X., Flood hazard risk assessment model based on random forest. Journal of Hydrology, 527, 1130-41, 2015.
[5] Bhandari, R., Parajuli, R., Lamichhane, G., Alyami, A., Kalra, A., Ahmad, S., et al. Utilizing Civil Geo-HECRAS Capabilities for Floodplain Mapping of Colorado River in Texas during Hurricane Harvey, 387-97 p, 2018.
[6] Hidro, S., Spillway – Operation, Surveillance and Maintenance Manual of Civil Works 2012.
[7] Schramm, P.J., Uejio, C.K., Hess, J.J., Marinucci, G.D., Luber, G., Climate models and the use of climate projections: a brief overview for health departments.
[8] Hirabayashi, Y., Tanoue, M., Sasaki, O., Zhou, X., Yamazaki, D., Global exposure to flooding from the new CMIP6 climate model projections. Scientific reports, 11(1), 3740, 2021.
[9] Limin, S., Oue, H., Takase, K., Estimation of Areal Average Rainfall in the Mountainous Kamo River Watershed, Japan. Journal of Agricultural Meteorology. 2015;71:90-7.
[10] Qing, Z., Gang, L., Zhiting, Z., editors. Improvement and optimization of Thiessen polygon method boundary treatment program. 2009 17th International Conference on Geoinformatics; 2009 12–14 Aug. 2009.
[11] Kadhim, Y., Allami, A., Al-Shamarti, H., Calculation of the mean annual rainfall in Iraq using several methods in GIS, 1156-60, 2020.
[12] Guide to hydrometeorological practices Geneva, World Meteorological Organization, 1965, Fr.S. 30. (WMO Report no 168. TP.82.). Journal of Hydrology, 4, 354, 1966.
[13] Bruce, J.P, Clark, R.H., CHAPTER 1 – INTRODUCTION. In: Bruce JP, Clark RH, editors. Introduction to Hydrometeorology: Pergamon, p. 1-4, 1966.
[14] Ward, R.C., Robinson, M., Principles of hydrology/R.C. Ward, M. Robinson. Third edition. ed. London: McGraw-Hill, 1990.
[15] Ahmed, K.F., Wang, G., Silander, J., Wilson, A.M., Allen, J.M., Horton, R., et al. Statistical downscaling and bias correction of climate model outputs for climate change impact assessment in the U.S. northeast. Global and Planetary Change, 100, 320-32, 2013.
[16] Malaysia DoIaD. HP 26: Hydrological Procedure. Estimation of Design Rainstorm in Sabah and Sarawak (Revised and Update 2018). 2018.
[17] Ng, J.L., Yap, S., Huang, Y., Noh, N., Al-Mansob, R., Razman, R., Investigation of the best fit probability distribution for annual maximum rainfall in Kelantan River Basin. IOP Conference Series: Earth and Environmental Science, 476, 012118, 2020.
[18] Khudri, M.M., Sadia, F., Determination of the Best Fit Probability Distribution for Annual Extreme Precipitation in Bangladesh. European Journal of Scientific Research, 103, 391-404, 2013.
[19] Singh, B., Rajpurohit, D., Vasishth, A., Singh, J., Probability Analysis for Estimation of Annual One Day Maximum Rainfall of Jhalarapatan Area of Rajasthan. Plant Archives, 12, 1093–100, 2012.
[20] Aksoy, H., Use of gamma distribution in hydrological analysis. Turkish Journal of Engineering and Environmental Sciences, 24, 419-28, 2000.
[21] Amin, M., Rizwan M., Alazba, P., A best-fit probability distribution for the estimation of rainfall in northern regions of Pakistan. Open Life Sciences, 11, 2016.
[22] Nithiyanantham S., Probability analysis for consecutive-day maximum rainfall for Tiruchirapalli City (south India, Asia). Applied Water Science, 2015.
[23] Baghel, H., Mittal, H.K., Singh, P.K., Yadav., K.K., Jain, S., Frequency Analysis of Rainfall Data Using Probability Distribution Models. International Journal of Current Microbiology and Applied Sciences, 8, 1390–6, 2019.
[24] E.M., Laurenson, RGM, and R.J., Nathan., RORB Version 6 – Runoff Routing Program User Manual, Monash University and Hydrology and Risk Consulting Pty Ltd, January 2010. 2010.
[25] BM Alliance Coal Operations Pty Ltd A., Flood Hydrology Technical Report, Red Hill Mining Lease EIS. 2013.
[26] SMEC, Baleh Hydroelectric Project – Hydrology review and update, Sarawak Energy Berhad, July 2013. 2013.
[27] SMEC., Baram Hydroelectric Project – Hydrology review and update, Sarawak Energy Berhad, June 2014. 2014.
[28] Selvalingam, S., Liong, S.Y., Manoharan, P., Application of RORB model to a catchment in Singapore. JAWRA Journal of the American Water Resources Association, 23, 81-90, 2007.
[29] Ogbonna, D., Okoro, B., Osuagwu, J., Application of flood routing model for flood mitigation in Orashi River, South-East Nigeria. Journal of Geoscience and Environment Protection, 05,31-42, 2017.
[30] Hussain, A., Flood Routing in Reservoir using Modified Puls Method. International Journal of Science and Research (IJSR), 2018.
[31] Chow, V.T., Open-channel hydraulics, New York: McGraw-Hill, 1959.
[32] Moriasi, D., Arnold, J., Van Liew, M., Bingner, R., Harmel, R.D., Veith, T., Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Transactions of the ASABE, 50, 2007.